Two interior renovation quotations often look comparable until the excluded works and provisional allowances are examined. A low number may omit demolition, electrical changes, joinery details or procurement. Whether the property is a Mid-Levels home or a Sheung Wan workspace, the most useful comparison shows what each interior design company in Hong Kong will deliver and which risks remain with the owner.
Compare design and renovation offers using scope, assumptions, programme, exclusions and materials rather than headline price alone.
Create one baseline before requesting prices
Supply identical plans, photographs, desired room uses and a schedule of work to each bidder. If the existing conditions are uncertain, identify which survey tasks are required. A common baseline prevents a proposal with less scope from appearing artificially efficient. Ask bidders to mark assumptions and to flag information that cannot be priced reliably yet.
Compare specifications alongside quantities
Look for material descriptions, thicknesses, fittings, hardware, appliances and installation standards. “Timber finish” could refer to several very different products. Request itemised allowances for floor finishes, partitions, lighting and custom joinery. Where a product has not been chosen, record the allowance and the mechanism for adjusting it after selection.
Make construction access a priced item
Managed buildings may restrict noisy work, delivery lifts, parking, waste movement or after-hours activities. These constraints affect labour and logistics. Ask how protection of common areas, debris removal and required submissions are allocated. Do not assume they are included simply because a contractor has worked in the district before.
Use a decision matrix, not just a cost total
Score proposals against design deliverables, technical coordination, experience, programme, warranty provisions, communication and price transparency. Clarify the change-control process and payment milestones. A realistic contingency allows for genuine unknowns; it should not become a substitute for properly defining the work. Request revised proposals on the same assumptions before appointment.
Example: a practical project decision
Example: Three quotations for a family apartment varied widely. After the owner separated demolition, kitchen fabrication, lighting fittings and building-management costs, the offers became understandable and a credible scope could be selected.
Putting this into practice
At the next review, ask the project team to issue the same brief and base drawings to all bidders. The following discussion should address how to identify every provisional sum and exclusion. Document the assumptions, responsible people and any unresolved questions before approving drawings or supplier orders. Before the next commitment, compare material grades and installation standards and request a written variation and payment procedure. Where building management instructions, technical submissions or specialist work are involved, seek the advice of properly qualified parties. A useful decision record explains not only what was chosen but why, with any effect on budget, maintenance, user comfort or construction programme clearly stated.
A short decision checklist
- Issue the same brief and base drawings to all bidders
- Identify every provisional sum and exclusion
- Compare material grades and installation standards
- Request a written variation and payment procedure
Frequently asked questions
Should I select the cheapest proposal?
Only after confirming scope, technical capability, quality standards and risk allocation. A lower headline price is not the same as lower overall cost.
When is a renovation price reliable?
After the site has been assessed and the critical drawings, quantities and specifications are sufficiently developed.